1998-2003
- Grabbed the opportunity & added product’s from chassis painting to Vehicle Cab painting.
- Painting process streamline & technology upgraded to achieve takt time of 10 mins per vehicle.
- Sudden production ramp up accommodated from 80 Nos to 220 Nos per day by installing parallel lines.
- Installed four lines of metallic & solid painting with top coat.